Shandong, China
Business Type:
Manufacturer/Factory & Trading Company
Registered Capital:
7.39 Million USD
Management System Certification:
Export Year:
OEM/ODM Availability:
OEM/ODM Service
Russian / Korean Speaker

Biomass Gasifier, Biomass Gasification Power Plant, Biomass Gasification Power manufacturer / supplier in China, offering Biomass Gasifier, Biomass Gasification Power Plant Tanzania 500kw Rice Husk Project, Natural Gas Generator with Cw-800 Low Price, 200kw 50Hz Electric Biogas Generator Set and so on.

Gold Member Since 2016
Audited Supplier
Supplier Homepage Products Others Biomass Gasifier, Biomass Gasification Power Plant Tanzania 500kw Rice Husk Project

Biomass Gasifier, Biomass Gasification Power Plant Tanzania 500kw Rice Husk Project

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $100-150,000/ Piece
Port: Qingdao, China
Production Capacity: 50sets/Month
Payment Terms: L/C, T/T
Output Type: AC Three Phase
Certificate: Quality Certified Under ISO 9001:2008 and Ce
Service: Accept OEM & ODM Production
Experience: 20 Years Professional Experience to Produce Gen-Se
Delivery Time: Short Product Cycle (15days Average)
Wordwide Service: Full Support From Worldwide Service Network

You Might Also Like


Basic Info

Model NO.: CW-400GFJ
Performance Price Ratio: Good Quality and Competitive Price
Trademark: CHARGEWE
Transport Package: Standard Seaworthy Packing or as Customers′ Re
Origin: Shandong, China
HS Code: 8501610000

Product Description

Biomass Generator Set


Biomass exists in various categories, on is in plants category such as wood,crop(straws of rice,wheat,bean,cotton,busk etc),weeds,algae and so on.others such as animal wastes,spoil and the organic exist in water and rubbish ect.

There are mainly three ways to generate power with biomass nowadays: gasification power generation, combustion generation and CHP technology.


Main Composition of Biomass Gas


After being gasified, the basis of gas are CO (20%), H2 (9%), CH4 (12%), CO2 (12%), O2 (1%), N2 (52%). The lower heating value is 5~6MJ/Nm3.


Efficiency of gasification: 1kg dried material can generate 2Nm3gas, conversation rate is more than 85%. 1kg dry material can generate 1kw.h power.

Requirement for Biomass gas

1.Within 1m to the intake valve of gas generator set.

2.Gas temperature ≤40°C

3.Pressure 3-10kpa,pressure changing rate≤1kpa/min

4. H2S≤200mg/Nm³

5. NH3≤20mg/Nm³

6.Moisture content≤40g/N m³

7.Impurity particle size≤5μm, impurity content≤30g/N m³

8.Heat value not less than 4.2MJ/ N m³


Notes: if there are too much sulfur and ammonia in the gas, it will not only corrode the electrode of sparking plug seriously but also increase the acid value of engine oil which will corrode the parts inside of gen-set, easy to generation sediment and increase the attrition corrosion to the engine.


Technical Data


Genset model


Engine No.


Gas mix type


Rated power


Continuous power


Rated voltage



3phase 4wire

Rated frequency


Rated rotation


Rated power factor


Rated current


Frequency volatility rate


Voltage regulating rage


Heat consumption


Lubricant consumption


Gas pressure


Cylinder number

12 v

Cylinder diameter




Compression ratio


Starting mode

24V motor

Overhaul time




Intake mode

supercharging ,inter cooed

Sparking mode

sparking plug

Voltage regulation mode


Speed regulation mode

electric speed regulate

Lubrication mode

pressure and splash

Cooling mode

circulating water cooled

Exhaust temperature




Genset size


Package and Shipping

Our service

We will send our technician to the site to guide you the installation of generator set, subsystem and relative equipment. We will debug the generator set till it can generate power successfully. We will also supply a technical training to the operators. You also can send your staff to our company. We can teach you till you can operate the generator set and during this time we can offer you board and lodging free of charge.


After-sale Service

1. In our company different people will in charge of different area, we will feedback periodically and support you technical service free of charge, include equipment debugging, fault eliminate, technical advice, maintenance assistant, etc.

2.For the quality problem, we will service for you free of charge during the guarantee period.

3.With one year guarantee period, we can service for you all the time.

4.We will give you an effective answer within 4 hours after received your service information and our service staff will come to your site within 4 hours.

5.When fault happens to the generator set, depending on the service principle of solving problem first, trying to recover the generator set as soon as possible then analysis the problem, we handle the quality problem in time. We insure to help our clients to gain the biggest economic profit.

6.We pursue survival with quality, strive for development with reputation. We are willing to build the beautiful future with our customer.

Send your message to this supplier

avatar Mr. Michael

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now